Blackberry Gate Closed This Weekend

April 18, 2013

The Blackberry Gate will be closed to vehicular traffic, from 7 a.m. on Saturday, April 20, to 5: p.m. on Sunday, April 21. Signs will be posted directing vehicles to the Strawberry gate. Pedestrians and bicycles will be able to pass through the Blackberry Gate, though bicycles will need to walk through the construction area. Vehicle access is maintained for Building 88.

Tags: , ,

Views: 937

Leave a Reply